Define administrative overtime precisely
Identify which overtime codes, time records, report activities, shifts, and organizational units are included or excluded.
Municipal savings estimates should be understandable, adjustable, and measured against actual operational results. This calculator reproduces the August 2026 proposal scenario without treating it as a forecast.
Default proposal formula
The original $259,200 result corresponds to a 24-week planning convention for the six-month pilot.
A calendar half-year can be approximately 26 weeks. The proposal’s stated total mathematically uses 24 weeks, so the methodology identifies that convention explicitly.
Measurement hierarchy
A credible evaluation should proceed in sequence rather than starting with a desired dollar result.
Identify which overtime codes, time records, report activities, shifts, and organizational units are included or excluded.
Account for seasonality, vacancies, major incidents, special events, leave, court, training, policy changes, and unusual operating conditions.
Use a defined test group and, where practical, a comparable pre-pilot period or control group rather than relying on department-wide before-and-after totals alone.
Determine whether lower hours reflect technology, staffing changes, fewer incidents, delayed work, coding changes, or another factor.
Use Finance-approved overtime cost methodology and avoid mixing cash compensation, total compensation, and budgetary rates.
Include licensing, integration, internal labor, security, legal, training, maintenance, support, and continuing technology expense.
Reporting discipline
Only hard-dollar savings should be represented as an actual expenditure reduction. Cost avoidance and capacity recapture should be reported independently.
Require evidence of an actual reduction in overtime or another expenditure compared with the approved baseline.
Document the future expenditure that otherwise would have occurred, the timing, and the evidence supporting that conclusion.
Report productive hours returned and where those hours were redeployed. Do not automatically convert every recovered hour into cash savings.
Decision gates
A pilot is useful even when it disproves an assumption. Predefined decision gates protect the City from continuing a program that does not produce sufficient value.
Validated financial and operational benefits exceed full costs, safeguards work, and results support a carefully controlled next phase.
Some value is demonstrated, but workflow, scope, data quality, cost, accuracy, or governance requires correction before expansion.
Benefits do not exceed cost, service measures deteriorate, risks cannot be controlled, or results cannot be reliably attributed to the pilot.
CityBudget.ai can help municipal leaders define the assumptions, baselines, value categories, safeguards, and decision thresholds needed for a defensible pilot evaluation.
Start a conversation